Research Result Summaries
Latest results from ongoing tasks
ESRI Survey123 Inspection Form for Commissioning of New Line Switches
Procedures for the deployment of inspection forms for the commissioning of new overhead transmission line switches using ArcGIS Survey123.
Quick Break Whip Testing – Intro on Interrupting Capacitive Currents
Information on quick break whip switches and why there is a need to test them can be obtained by clicking on the link.
Line Switch Commissioning 101
There are many reasons why line switches do not work correctly over time. Utilities can avoid many operational issues if the component is specified for actual environmental exposure conditions and installed per the design requirements.