P37.105: Balance of Substations: Batteries, Arresters and Ratings

Past EPRI Work on Topic

Product ID Title Description Published Date
3002030041 Battery Monitoring SystemsProcurement Guide for Substation Applications This is a quick referenceguide describing considerations when selecting and procuring a batterymonitoring system for an existing battery bank installation to preventunexpected project delays. June 2024
3002027110 Insights and Considerations from Substation Battery Monitoring SystemEvaluation and Testing This report describes multi-year efforts by EPRI to evaluate variousbattery monitoring systems through 2023. December 2023
3002030040 Robotics Assisting ElectricalSubstation Inspectors This report documents theresults of a quadruped robotics deployment performed in EPRI’s 138-kVresearch substation. Various tests evaluated the capabilities and limitationsof the robot in a substation environment for navigation, data collection, andreporting, under varied environmental conditions. November 2024
3002030267 EPRI Increased Power FlowGuidebook – 2024: Increasing Power Flow in Lines, Cables, and Substations
This guidebook is a best practice reference on increasing power flowcapabilities of overhead transmission lines, underground cables, powertransformers, and substation equipment. December 2024
3002031149 EPRI Facilitating Adoption ofFERC Order 881 for Substation Equipment – 2024 Update This document explores theintricacies of Advanced Line Ratings and their application at transmissionutilities including Ambient Air Adjusted ratings of substation assets such asswitches, breakers, and bus materials. December 2024