EPRI logo_WhiteCreated with Sketch. Transmission and Substations
  • Programs
    Program 34: Transmission Asset Management Analytics Program 35: Overhead Transmission Program 36: Underground Transmission Program 37: Substations GET SET EPRI U for Transmission Contaminated Insulation Interest Group (CIIG) EPRI Transmission Sector Council (TSC)
  • Resources
    Applications Capabilities Technical Leads White Papers Area Information Documents Success Stories Technology Radar Map Transmission Asset Chatbot (TAC)
Full site Overhead Transmission 2026 Planned Research
Go to search page
About

Site search

  • Overhead Transmission
      • 2026 Planned Research
          • Project 35.001 – Inspection and Assessment
          • Project 35.002 – Conductor, Shield Wire, and Hardware Corrosion
          • Project 35.003 – Structure and Foundation Corrosion Management
          • P35.004 Traditional Conductors and Connectors
          • P35.005: Ductile Iron and Composite Structures
          • P35.006 Lightning Performance and Grounding
          • P35.007: Line Design
          • P35.008: Line Resiliency
          • P35.010: Live Working: Research, Techniques and Procedures
          • P35.011: Polymer and Composite Overhead Transmission Line Insulators
          • P35.012: Porcelain and Glass Overhead Transmission Line Insulators
          • P35.013: Overhead Line Ratings and Increased Power Flow
          • P35.014: High Temperature Operation of Overhead Lines
          • P35.015: Qualification, Selection and Maintenance of Advanced Conductors
          • P35.018: Line Switch Management
          • P35.019: HVDC Lines
      • Inspecting and Assessing Overhead Transmission Lines
      • Transmission Line Corrosion
      • Transmission Line Switch Management
      • Lightning Performance and Grounding of Transmission Lines
      • Transmission Line Design
      • Live Working
      • Transmission Line Insulators
      • Increased Overhead Transmission Capacity
      • 2024 Deliverables
      • Contacts
      • Supplemental Projects
  • ← Previous
  • Next →

Print entire section
  1. Overhead Transmission
  2. 2026 Planned Research

2026 Planned Research

The research team is happy to share our plans for this year’s R&D. Thanks to all of our utility advisors that have given input throughout the planning process. We are excited to continue working together!

P35.001: Inspection and Assessment
P35.002: Conductor, Shield Wire, and Hardware Corrosion
P35.003: Structure and Sub-Grade Corrosion
P35.004: Traditional Conductors and Connectors
P35.005: Ductile Iron and Composite Structures
P35.006: Lightning Performance and Grounding
P35.007: Line Design
P35.008: Line Resiliency
P35.010: Live Working
P35.011: Polymer and Composite Insulators
P35.012: Porcelain and Glass Insulators
P35.013: Line Ratings and Increased Power Flow
P35.014: High Temperature Operations
P35.015: Advanced Conductors and Connectors
P35.018: Line Switches
P35.019: HVDC Lines

Copyright PolicyPrivacy StatementTerms Of UseContact Us
company logo

EPRI 3420 Hillview Avenue, Palo Alto, California 94304 | 800-313-3774

© EPRI, Inc. 2001-2025. All Rights Reserved